Paving Day: What Happens and How Long to Stay Off New Asphalt
If you have never had a driveway or lot paved, the day can look loud and hectic. It follows a clear order, though. Knowing the order helps you plan where to park and what to expect.
Before the day
Move cars, trailers and anything else out of the area. Tell us about sprinkler heads, lights and anything buried that we should avoid. If a neighbor shares your driveway, let them know the date.
Step 1: Prep and grade the base
The first part of the day is not the part you picture. Old asphalt or loose material is removed if needed. Soft spots are fixed. The base is shaped so water runs off and compacted so it is firm. This is the step that decides how the pavement holds up, so it is not rushed.
Step 2: The paver lays hot-mix asphalt
Trucks bring hot-mix asphalt to the site. The paver spreads it over the base in an even layer, moving along the driveway or lot one pass at a time. The asphalt is hot and has a strong smell. Keep children and pets well away from it.
Step 3: The roller compacts it
A roller follows behind the paver. It presses the asphalt down so it is dense and smooth. Timing matters here, because the asphalt must be compacted while it is still warm.
Edges and finishing
The crew shapes the edges and ties the new surface in to the garage, the street or the neighboring pavement. On a parking lot, the lines and markings are painted after the asphalt has firmed up.
Walking and driving on it
New asphalt is soft at first and firms up as it cools. Your crew will tell you when you can walk on it and when you can drive on it, because it depends on the weather and the job. Warm weather slows the firming. Cooler weather speeds it. Do not treat any number you read online as a promise.
While it is still new, these habits help:
- Keep heavy vehicles and trailers off until you are told it is ready
- Avoid turning your steering wheel while the car is not moving
- Do not park in the same spot every day at first
- Keep the edges clear of tires, since they are the softest part
- Keep kickstands, ladders and furniture feet off the surface
Normal marks
Small marks and scuffs can show up in new asphalt in the first weeks. Many fade or fill in as it settles. Tell your paver about anything that worries you.
Weather
Hot-mix asphalt needs warm, dry weather. In Iowa, that means paving runs from spring to fall. If rain or cold is coming, a good crew will move the date instead of paving in bad conditions.