Asphalt Paving Contractor
Drive the Paver. See It Smooth.
Driveways, parking lots and private lanes in Lake Elsinore. Pick yours and drag the paver across it. Then let us pave the real one.
What are we paving?
A home driveway. The usual job: fix soft spots in the base, lay hot-mix asphalt from the street to the garage, and roll it smooth with clean edges.
Paved. Smooth from the street to the garage, with room to park again.
A parking lot. The usual job: repair the base, pave it in passes side by side, roll it, then paint the stalls and arrows once the surface has cooled.
Paved. The stall lines and arrows go on last, once the surface has cooled.
A private lane or shared road. The usual job: shape it so water runs off the sides, pave the full length, and roll it.
Paved. A smooth run from the road to the yard, shaped so water runs off.
Hot mix goes down behind the paver. The roller follows and presses it smooth while it is still hot.
A simple picture, not your property. General guidance, not a quote.
- Driveways
- Parking Lots
- Private Lanes

What we pave
Paving Services in Lake Elsinore
Whatever you just paved in the picture, these are the jobs we do for real.
No services configured yet.
How we work
How a Paving Job Goes
What you dragged across the picture takes three machines on a real job.
-
Machine 1 · The base
Prepare the Base
Soft spots are dug out, and the stone base is graded so water runs off and packed firm.
-
Machine 2 · The paver
Lay the Hot Mix
The paver spreads hot-mix asphalt in an even layer, one pass beside the next.
-
Machine 3 · The roller
Roll It Smooth
The roller presses the mat while it is still hot, so the surface ends up dense and level.
Price check
Asphalt Paving Cost & Tonnage Estimator
It starts on what you picked in the picture. Set the size and the kind of work to see a ballpark range and the asphalt it takes.
1. Property type
Small Drive (500 sqft)Large Drive (5000+ sqft)
3. Required service type
Estimated range
$4,631 – $5,850
- Hot-mix asphalt
- 18.0 tons
- Expected lifespan
- 10-15 Yrs (Structural)
- Est. duration
- 2-4 Days
Based on standard 2-inch compacted yield.
Includes edge milling, tack coat bonding, 2-inch hot-mix asphalt application, and vibratory compaction.
A ballpark only. Your real price comes after we walk the site with you.
Where we pave
Paving Contractor Near Lake Elsinore
Pick your town to see the paving work we do there.
The last pass
Ready for the Real Paver?
Tell us what you want paved. We will come look at the site and write up an estimate.
Your job Driveway